Rusty and one of his workers came out this morning and layed the polyand positioned the steelfor tieing. Some of the steel was tied ,but they ran short and called for additional steel. It was delivered that evening and additional 4 loads of sand was delivered to be used for back grade away from the slab.
Ed and Billy showed up later in the evening to connect the water lines. As Ed soldered the headers
Billy cleaned and fitted the fittingskeeping just ahead of Ed.