A House For All Seasons And Reasons

Laying Big Pipe
August 11, 2003

As I mentioned before Paul came for a visit the week-end and after extending the sewer trench we started laying pipe. We had to keep checking the fall (angle of decline) to insure a good flow. Paul went in about 11:30 pm and I continued on to the end. Sewer line #1 come from the guest bath, #2 from the master bath and they are interconnected by a 30 foot run30 ft run.JPG.

Next thing I knew the sky was getting light in the East, which is a sure sign of the coming of another day. I went in to see Pam, take a bath, and lay down.


TC and Cleedy arrived about 7:30 ‘ish followed by Thad. There was some confusion as to whether there would be any work today or not so I tried calling Gary to no avail. The two youn’uns left about 8:45 am, then David showed up. He and Thad attached weld plates to the remaining rafters, but could go no future, so by 10: 45 am they to were gone.

After several calls I put the phone on the answering machine and crashed.

Posted by Buddy at 12:46 PM | Comments (0)